You are the Exhibitions Officer in Gallery and Exhibitions.
What has happened
Surface Tension brings together six ceramic artists and opens on 2 October. Installation runs from 29 September, three works have yet to arrive, and the Production Risk Assessment for the install is not signed. The works include heavy glazed wall panels that need rated fixings, a floor installation of 300 tiles with an uneven surface, raku vessels with fragile surfaces and a work with an existing hairline crack recorded on its incoming report. One artist's panels come with a cultural protocol note about handling and photography. The elevated work platform was used without its pre-start checklist last week and a hazard entry is open in the WHS register.
Deliverables
- Three incoming condition reports and updated register entries
- Signed Production Risk Assessment
- Hanging and floor plan with fixings and access paths
- Updated WHS register and schedule entries
Documents to use
Systems to use
Artwork and Loans Register
Records every artwork in the gallery's care with its lender, insurance value, condition report status, location and loan dates.
WHS Incident and Hazard Register
Records every injury, near miss, hazard and equipment failure reported across the company with its risk rating, actions and close-out.
Production and Venue Schedule
Books the theatre, gallery, studio and crew for rehearsals, bump ins, shows, shoots and installations and tracks whether the safety paperwork is in place.
Units of competency
Current on training.gov.au for the Creative Arts and Culture Training Package as at 10 September 2026.
CUAPPR417Select and prepare creative work for exhibitionCUAPPR403Store and maintain finished creative workCUAWHS312Apply work health and safety practicesCUAPPR408Integrate disability access and inclusionCUAATS514Work with Aboriginal and/or Torres Strait Islander cultural materialQualifications
CUA40825Certificate IV in Arts and Cultural AdministrationCUA51125Diploma of Visual ArtsWhat to look for
Evidence guide
Condition reports must describe and photograph existing damage accurately and be countersigned where the lender is present. The risk assessment must rate the platform and manual handling realistically with named controls. The plan must show rated fixings, a one metre access path and accessible labels, and the cultural protocol must be applied to handling and photography, not just acknowledged.