Simulated workplaceCAQA Studio Aurora is a fictional business created by CAQA for training and assessment. It is not a real company and no person, client or record here is real.About this simulation
CUACAQA Studio AuroraSimulated workplace
Simulated workplace
Controlled documents

Document library

Controlled policies, procedures, forms, templates, registers and plans. Forms and templates can be completed on screen and printed.

14 documentsFormPlanPolicyProcedureRegisterTemplate
CodeDocumentTypeOwnerVersionNext review
AUR-POL-001Work Health and Safety Policy
This policy states Studio Aurora's commitment to the health and safety of staff, freelancers, artists, performers, visit
PolicyOperations and Finance Manager3.210 February 2027
AUR-POL-002Copyright, Moral Rights and Intellectual Property Policy
This policy sets out how Studio Aurora creates, licenses, uses and credits creative work so that the company, its client
PolicyOperations and Finance Manager2.518 March 2027
AUR-POL-003Child Safe Policy
This policy commits Studio Aurora to the safety and wellbeing of children and young people who take part in its performa
PolicyManaging Director2.14 December 2026
AUR-POL-004Privacy and Image Consent Policy
This policy sets out how Studio Aurora collects, uses and protects personal information about audiences, artists, perfor
PolicyOperations and Finance Manager1.722 January 2027
AUR-PRO-001Design Job Procedure: Brief to Delivery
This procedure sets the stages every design job must pass through from the first client conversation to delivered files
ProcedureDesign Studio Manager3.02 March 2027
AUR-PRO-002Bump In and Bump Out Procedure
This procedure sets the sequence, safety controls and records for loading in, setting up, testing, running and loading o
ProcedureProduction Manager2.815 January 2027
AUR-PRO-003Artwork Handling, Condition Reporting and Installation Procedure
This procedure sets how artworks are received, condition reported, handled, installed, stored and returned so that every
ProcedureGallery Curator2.29 February 2027
AUR-PRO-004Studio and Location Shoot Procedure
This procedure sets the planning, safety, consent and media management steps for every studio and location shoot so that
ProcedureHead of Screen Production2.427 February 2027
AUR-FRM-001Incident and Hazard Report Form
Any worker completes this form on the day for every injury, near miss, hazard, equipment failure or property damage so t
FormOperations and Finance Manager2.010 February 2027
AUR-FRM-002Talent and Location Release Form
Performers, interviewees, extras and location owners complete this form to give Studio Aurora and its client permission
FormHead of Screen Production1.622 January 2027
AUR-TPL-001Creative Brief Template
Designers and producers use this template to capture and confirm a client brief so that concept, artwork and delivery ca
TemplateDesign Studio Manager2.32 March 2027
AUR-TPL-002Production Risk Assessment Template
Department leads use this template to identify hazards, rate risks and record controls for every bump in, shoot, install
TemplateProduction Manager3.115 January 2027
AUR-REG-001Equipment Test and Tag Register
This register lists every item of electrical and rigging equipment owned or hired by Studio Aurora, its test status and
RegisterProduction Manager4.015 January 2027
AUR-PLN-001Emergency Management and Evacuation Plan
This plan sets out how Studio Aurora responds to fire, medical emergency, structural or rigging failure, threat, power f
PlanOperations and Finance Manager2.66 May 2027