Plan an outdoor launch event
You are the Assistant Production Manager in Live Production and Events.
What has happened
Halcyon Property Group is launching its Riverside development on 20 November with an outdoor event for 400 guests on a riverbank site, job J26-0410. The design includes a stage, a lighting truss on ground support, a large LED screen, a sound system and a haze effect for the reveal. The client has asked for a fireworks finale. The site has soft ground near the river, a public walking path through it, no permanent power and a weather exposure that has already blown over a light stand on a nearby shoot this month. Nine crew are pencilled in the Production and Venue Schedule and the risk assessment is not started. The Production Manager wants the plan by 30 September.
Deliverables
- Production schedule with hold points
- Crew roster with licensed operators
- Completed Production Risk Assessment and weather contingency plan
- Fireworks recommendation and client summary
Documents to use
- Bump In and Bump Out Procedure Procedure
- Production Risk Assessment Template Template
- Work Health and Safety Policy Policy
- Equipment Test and Tag Register Register
Systems to use
Production and Venue Schedule
Books the theatre, gallery, studio and crew for rehearsals, bump ins, shows, shoots and installations and tracks whether the safety paperwork is in place.
Project and Job Board
Tracks every client job and internal production from brief to archive with its stage, owner, budget, deadline and approvals.
WHS Incident and Hazard Register
Records every injury, near miss, hazard and equipment failure reported across the company with its risk rating, actions and close-out.
Units of competency
Current on training.gov.au for the Creative Arts and Culture Training Package as at 10 September 2026.
CUAPPM431Compile production schedulesCUAPPM514Manage bump in and bump out of showsCUAPPM513Incorporate creative and technical needs into management processesCUALGT513Manage lighting operations for outdoor eventsCUASOU511Manage audio operations for outdoor eventsQualifications
CUA50425Diploma of Live Production and Technical ServicesCUA60225Advanced Diploma of Live Production and Management ServicesWhat to look for
Evidence guide
The schedule must be sequenced correctly with realistic durations and hold points. The risk assessment must treat wind, soft ground and the public path as high risks with engineering controls and named owners, and must include stop authority. The fireworks recommendation must be grounded in real permit and licensing requirements and offer a safe alternative rather than simply saying no.